Oak Ridge Sludge Processing Facility Building Modifications

CH2M contracted AEM to develop material balance calculations and a flowsheet document for the facility to be used to retrieve and treat Melton Valley Storage Tank (MVST) waste at the Oak Ridge Site. AEM subject matter experts (SMEs) additionally developed preliminary simulant recipes for the full-scale testing of the process and its Critical Technology Elements (CTEs).

Back to Services