Flowsheet Development for 242-AY-102 Waste Feed Delivery

AEM developed a preliminary flowsheet for delivery of the hot commissioning feed from 241-AY-102 to the Waste Treatment and Immobilization Plant (WTP) in accordance with TFC-ENG-CHEM-C-01, Process Flowsheets Procedure. The final product document includes a process description and material balances supported by a simplified heat balance to estimate water evaporation from waste over the extended storage time periods and during heating predicted to occur during tank mixing activities.

Back to Projects